Budget

For this project the main costs will be for the material used to make the base, back, and side, but given that the school will provide most of materials so the overall cost will be nothing. The only other cost will be the spring used to push the punch back to initial position after cut the material. The punch material has already been provided. The arbor press that will be used is already provided and is yet another saved cost.

Budget/Schedule: About
Screen Shot 2020-04-20 at 4.24.15 AM.png

Schedule

The schedule for the project will take place over three quarters. The first quarter (fall) will be when the proposal is written. The second quarter (winter) will consist of final design changes and construction of the design. Lastly, the third quarter (spring) will be when testing of the project will be completed and when presentations will begin.